Home » Posts tagged with » SSCB

\ \ \ \ \

Molds, water leaks prompt SSCB repairs

Within the next six to 12 weeks, SSCB is expected to undergo renovations due to improper architectural and construction practices, which UHCL is addressing through litigations.

Keep off the grass

\ \

Keep off the grass

Barracades placed in front of the Student Services Class Building prevent students from using a popular short cut between the sidewalk and entrance to the building.

\ \ \ \ \

Black Mold?!?

A satirical take on the “mold situation” inside the Student Services and Classroom Building at the University of Houston-Clear Lake.